We have worked on numerous educational institutions and are familiar with the rapid delivery schedules and tight timelines that they require. We continually perform beyond expectations in these complex and demanding projects.

 


Highslide JS   

Washington High School, Fremont

 

Washington High School, Fremont

This renovation project included installation of roof top AC units for 35 classrooms and installation of Dykin multi-zone system for the administrative/ library building.

The project incorporated installation of Energy Management System.

LIAS Mechanical installed architectural sheet metal on this project.

 

 

Highslide JS  

John Blacow Elementary School, Fremont


John Blacow Elementary School, Fremont

This renovation project included installation of rooftop A/C units for 30 classrooms

The project incorporated installation of Energy Management System.

 

Highslide JS

San Rafael High School, San Rafael

 

San Rafael High School, San Rafael

 

Highslide JS

Olone College Child Development Center, Fremont

Olone College Child Development Center, Fremont

This new construction project included installation of 30 ton multi-zone system with chiller, boiler and VAV.

The project incorporated installation of Energy Management System.

 

Highslide JS

Lydiksen Elementary School, Pleasanton

Lydiksen Elementary School, Pleasanton

This new construction project included installation of rooftop A/C units for 24 classrooms.

The project incorporated installation of Energy Management System.

 

Highslide JS

Contra Costa College Child Development Center, Pleasant Hill

Contra Costa College Child Development Center, Pleasant Hill

This new construction project included installation of rooftop A/C units.

The project incorporated installation of Energy Management System

 
















25613 Dollar Street, Suite 5

Hayward, CA 94544

Phone (510) 733- 5585  Fax (510) 733-5586

www.lias.biz